Wayne County Care Center Water System Improvements, Wooster, Ohio
Engineering Associates, Inc. provided services included detailed design, construction administration, and construction observation of a new 17,000 gallon per day water supply, treatment, and storage system for the Care Center. The water supply consisted of two new groundwater wells. Treatment consisted of pressure filters to remove iron and manganese, pressure softeners to remove hardness, and disinfection. Storage consisted of 75,000 gallon elevated water tank. This project was funded in part by grants from the Ohio Public Works Commission and CDBG. The construction cost was $700,000.
Engineering Associates is a full-service civil engineering firm providing infrastructure and transportation design services throughout Ohio. Since 1957 we have delivered cost effective, reliable engineering solutions on projects across a broad spectrum including highways, bridges, water system, wastewater, storm sewer and recreational.