OARDC Discovery Pavilion, Wooster, Ohio
OARDC Discovery Pavilion, Wooster, Ohio Engineering Associates, Inc. prepared construction plans for a 16-sided timber educational pavilion structure for the Ohio State University Ohio Agricultural Research and Development Center located in Wooster, Ohio. The structure has an interior dimension of 26’-0” face to face of treated timber posts. The use… Read more
Salt Storage Facility, Orrville, Ohio
Salt Storage Facility, Orrville, Ohio Engineering Associates, Inc. prepared construction plans for a 40’ x 50’ salt storage building with a capacity to store approximately 500 tons of salt. The storage facility utilized a corrosion resistant pre-engineered aluminum truss arch roof with a fabric membrane and reinforced concrete foundations, floor… Read more