WAY-71-0.28, ODOT District 3

Engineering Associates, Inc. provided engineering services for a District 3 project that replaced the existing four lane divided highway with a new six lane divided highway. The project included roadway design, structural design, part-width maintenance of traffic, rest area parking area re-configuration using MSE walls, and slope repair. The average daily traffic was 45,100. The project was 6.76 miles long with a construction cost of $26,800,000.


Engineering Associates is a full-service civil engineering firm providing infrastructure and transportation design services throughout Ohio. Since 1957 we have delivered cost effective, reliable engineering solutions on projects across a broad spectrum including highways, bridges, water system, wastewater, storm sewer and recreational.