WATER PROJECTS

Fredericksburg Water System Improvements, Fredericksburg, Ohio
FredricksburgEngineering Associates, Inc. provided services including detailed design, construction administration and construction observation for the construction of a waterline to a new water reservoir. Improvements included 3,000 feet of 8" waterline replacement and a 160,000 gallon prestressed concrete water storage tank. This project was funded in part by grants from the Ohio Public Works Commission and CDBG. The construction cost was $925,000.

 

Wayne County Care Center Water System Improvements, Wooster, Ohio
Wayne CountyEngineering Associates, Inc. provided services included detailed design, construction administration, and construction observation of a new 17,000 gallon per day water supply, treatment, and storage system for the Care Center. The water supply consisted of two new groundwater wells. Treatment consisted of pressure filters to remove iron and manganese, pressure softeners to remove hardness, and disinfection. Storage consisted of 75,000 gallon elevated water tank. This project was funded in part by grants from the Ohio Public Works Commission and CDBG. The construction cost was $700,000.

 

 

Doylestown South Well Field and Raw Water Line, Doylestown, Ohio
DoylestownEngineering Associates, Inc. provided services including the detailed design, construction administration, and construction observation for a new 300 gallon per minute water supply well and 18,000 feet of 12" water line. The water well included a radio telemetry control system. The construction cost was $1,000,000.

 

 

Lodi Water Treatment Plant, Lodi, Ohio
LodiEngineering Associates, Inc. provided services including the preliminary report, detailed design, construction administration and construction observation for a new water treatment plant. Improvements included a new 1.350 million gallon per day water treatment plant providing iron and manganese removal by chemical oxidation and pressure filtration, softening by pressure ion exchange softeners , disinfection, fluoridation and corrosion control. The construction cost was $970,000.

West Salem Water Treatment Plant, West Salem, Ohio
West SalemEngineering Associates, Inc. provided services including the preliminary report, detailed design, construction administration and construction observation for a new water treatment plant. Improvements included a new 0.288 million gallon per day water treatment plant providing iron and manganese removal, softening, solids reduction, disinfection, fluoridation and corrosion control. Iron and manganese removal will be accomplished by chemical oxidation followed by pressure filtration, softening and solids reduction will be accomplished by nanofiltration and disinfection, fluoridation and corrosion control will be accomplished by chemical addition. This project also included a pilot study of the nanofiltration membrane as required by Ohio EPA, two 200 gallon per minute wells and 2,150 feet of 8 to 18 inch transmission main. The construction cost was $1,954,000.