STORM SEWER PROJECTS

College Street Storm Sewer Improvements, Wadsworth, Ohio
College StreetEngineering Associates, Inc. provided detailed design of a 200 lineal foot box culvert located near downtown Wadsworth. Project included gabion walls at the outlet of the culvert due to site constraints. Project also included replacement/relocation of sanitary and storm sewers in the vicinity of the project. The construction cost was $320,000.

 

Crown Hill Detention Basin, Orrville, Ohio
Crown HillEngineering Associates, Inc. provided services including detail design, construction administration and construction observation of a storm water detention basin with a storage volume of 16.5 acre - foot. The basin also serves as a BMP (Best Management Practice) for a water quality volume of 4,100 cubic feet. The construction cost was $439,000.

 

Carrollton Storm Sewer, Carrollton, Ohio
CarrolltonEngineering Associates, Inc. provided services including detailed design, construction administration and construction observation for a storm sewer project that included 9,000 feet of storm sewer, 75 catch basins. 19 manholes and a 100,000 cubic foot storm water detention basin. The construction cost was $943,000.