WAY – C.R. 86 – 6.325 Smithville Western Road , Wayne County, Ohio
CR 86Engineering Associates, Inc. provided detailed design for improvement of 475 feet of C.R. 86 (Smithville Western Road) in the City of Wooster, by replacement of an existing 22 foot concrete slab structure over Little Apple Creek with an 18’ x 10’ Box Culvert, including upgrading of guardrail, drainage and pavement marking. The construction cost was $236,000.


WAY CR 8 – 0.243 96-054, Wayne County, Ohio
CR 8Engineering Associates, Inc. provided detailed design for a project that replaced an existing deficient bridge on County Road 8 (Shreve Eastern Road) in Wayne County with a single span prestressed box beam bridge over Shreve Creek. The construction cost was $235,000.00



WAY-30-19.54 (Kansas Road Overpass), ODOT District 3
Way 30Engineering Associates, Inc. provided detailed design for an ODOT District 3 project for a new roadway and two-span bridge over recently constructed U.S. 30. The project was 2,600 feet long and was coordinated with the U.S. 30 construction. The project was completed with a compressed project schedule requiring extensive coordination with District 3 Production and Construction staff members and the contractor. The construction cost was $1,300,000.


TRU-82-(25.24)(29.62), ODOT District 4
TRU 82Engineering Associates, Inc. provided services as lead roadway designer for a project that rehabilitated three sets of twin structures and one other structure on State Route 82 in Trumbull County.




WAY-71-0.28, ODOT District 3
Way 71Engineering Associates, Inc. provided engineering services for a District 3 project that replaced the existing four lane divided highway with a new six lane divided highway. The project included roadway design, structural design, part-width maintenance of traffic, rest area parking area re-configuration using MSE walls, and slope repair. The average daily traffic was 45,100. The project was 6.76 miles long with a construction cost of $26,800,000.