AGRICULTURE PROJECTS

Ayers Farm Manure Settling Basin, Perrysville, Ohio
AyersEngineering Associates, Inc. provided services including detailed design, and construction observation of a manure settling basin and sand separation lane. The reinforced concrete basin contained weep walls to remove and store solids. The basin has a storage volume of 202,500 cubic feet.

 

 

NRCS: Joseph Frankenberg Dairy Manure Storage Facility, West Salem, Ohio
NRCSEngineering Associates, Inc. provided services including detailed design of a concrete 58,000 cubic foot manure storage facility for the Frankenberg Dairy Farm. The construction cost was $245,000.

 

 

 

Sunset Valley Dairy Farm Manure Storage Facility, Stone Creek, Ohio
Sunset ValleyEngineering Associates, Inc. is providing services including detailed design and construction observation of a manure settling tank and sand separation lane. The reinforced concrete tank contains weep walls to dewater and storm manure solids. The tank has a capacity of 84,000 cubic feet.